top of page
Cable-Stayed Bridge

VDC & BIM Coordination

Resolve Clashes on Screen, Not on Site

Building Wireframe Design
Engineer Reviewing Blueprint

We federate architectural, structural and MEP models, run clash cycles to your programme, and track every issue to closure.

 

Three kinds of clash are found, assigned, fixed and re-checked in cycles:

  • Hard clashes: two elements in the same space, such as a duct through a beam

  • Soft clashes: missing clearance for access or maintenance

  • Workflow clashes: conflicts in sequence, delivery or trade access

Why MANSYCOM

Noida International Airport, with Tata Projects: BIM management covering the BEP, model audit and coordination, from preliminary design through construction.

 

Nagpur Metro: 3D BIM and coordination for 8 stations, including an interchange.

Modern Concrete Building

What You Get

Futuristic Concrete Building

Every engagement comes with clear, usable deliverables:

  • Federated coordination model: all disciplines in one model (NWD/NWC, RVT, IFC)

  • Clash reports: grouped by discipline, level and zone, with viewpoints (PDF/Excel, BCF)

  • Issue log and dashboard: open vs resolved clashes by trade, week on week

  • Coordinated drawings: combined services drawings, sections and builder's work openings

  • Meeting minutes and decision log: who agreed what, and when

  • Sign-off package: final clash-free status per zone, ready for shop drawings

How We Work

A clear five-step workflow:

  • 1. Kickoff and BEP: coordinate system, LOD, clash rules, tolerances and meeting rhythm

  • 2. Model audit: check each incoming model before any clash run

  • 3. Clash cycles: run the clash matrix by zone and level and filter false positives

  • 4. Resolve and track: assign issues to trades and re-test after each fix

  • 5. Sign-off: zone-by-zone sign-off with drawings and the model issued for construction

Cleaning Building Windows

Tools & Standards

Team Planning Session

We work to open standards and your BIM Execution Plan:

  • Software: Autodesk Revit, Navisworks and AutoCAD

  • Standards: ISO 19650, BIMForum LOD, COBie and IFC (ISO 16739)

  • Inputs: models, PDF or DWG drawings, sketches and specifications

  • Outputs: RVT, IFC, NWC, DWG, PDF and XLSX

Where We Use It

Where this service makes the biggest difference:

  • Airports and metro stations

  • High-rise residential and commercial towers

  • Hospitals, hotels and campuses

  • Industrial and infrastructure projects

Virtual Reality Experience

Ways to Work With Us

Team Training Session

Start small and scale up. Choose the engagement that fits your project and your team:

  • Coordination-risk review: send one level or zone and get a prioritised clash report

  • Dedicated coordination team: named BIM coordinators working in your CDE and meetings

  • Fixed-scope project: defined zones, LOD and deliverables, priced up front

Frequently Asked Questions

Answers to the questions project teams ask us most often:

  • When should coordination start? At design development. A clash found at DD costs a model edit; found on site, it costs rework and delay.

  • How often do you run clash cycles? Weekly by default, or to your programme and meeting rhythm.

  • Can you join our coordination meetings? Yes. We run or attend them online and keep the issue log current.

  • What if we only have 2D drawings? We model the missing disciplines from your drawings first, then coordinate.

Job interview
bottom of page