top of page

Home / BIM Services / BIM & VDC Services

VDC & BIM Coordination

Federated models, clash cycles and issue tracking until every zone is clash-free.

Since 2006

Delivering BIM and VDC

900+

Projects delivered

ISO 9001

Certified quality system

OVERVIEW

Resolve Clashes on Screen, Not on Site

We federate architectural, structural and MEP models, run clash cycles to your programme, and track every issue to closure.

 

Three kinds of clash are found, assigned, fixed and re-checked in cycles:

  • Hard clashes: two elements in the same space, such as a duct through a beam

  • Soft clashes: missing clearance for access or maintenance

  • Workflow clashes: conflicts in sequence, delivery or trade access

VDC & BIM Coordination overview

DELIVERABLES

What you get

Every engagement comes with clear, usable deliverables:

01

Federated coordination model: all disciplines in one model (NWD/NWC, RVT, IFC)

02

Clash reports: grouped by discipline, level and zone, with viewpoints (PDF/Excel, BCF)

03

Issue log and dashboard: open vs resolved clashes by trade, week on week

04

Coordinated drawings: combined services drawings, sections and builder's work openings

05

Meeting minutes and decision log: who agreed what, and when

06

Sign-off package: final clash-free status per zone, ready for shop drawings

PROCESS

How we work

A clear five-step workflow:

1

2

3

4

5

Kickoff and BEP

Coordinate system, LOD, clash rules, tolerances and meeting rhythm

Model audit

Check each incoming model before any clash run

Clash cycles

Run the clash matrix by zone and level and filter false positives

Resolve and track

Assign issues to trades and re-test after each fix

Sign-off

Zone-by-zone sign-off with drawings and the model issued for construction

VDC & BIM Coordination project

PROVEN ON SITE

Why MANSYCOM

Noida International Airport, with Tata Projects: BIM management covering the BEP, model audit and coordination, from preliminary design through construction.

 

Nagpur Metro: 3D BIM and coordination for 8 stations, including an interchange.

TOOLS & STANDARDS

Tools & standards

We work to open standards and your BIM Execution Plan:

Software

Autodesk Revit, Navisworks and AutoCAD

Standards

BIMForum LOD, COBie and IFC (ISO 16739)

Inputs

models, PDF or DWG drawings, sketches and specifications

Outputs

RVT, IFC, NWC, DWG, PDF and XLSX

SECTORS

Where we use it

Where this service makes the biggest difference:

Airports and metro stations
High-rise residential and commercial towers
Hospitals, hotels and campuses
Industrial and infrastructure projects

Airports and metro stations

High-rise residential and commercial towers

Hospitals, hotels and campuses

Industrial and infrastructure projects

ENGAGEMENT

Ways to work with us

Start small and scale up. Choose the engagement that fits your project and your team:

OPTION 1

Coordination-risk review

Send one level or zone and get a prioritised clash report

OPTION 2

Dedicated coordination team

Named BIM coordinators working in your CDE and meetings

OPTION 3

Fixed-scope project

Defined zones, LOD and deliverables, priced up front

FAQ

Frequently asked questions

Answers to the questions project teams ask us most often:

When should coordination start?

At design development. A clash found at DD costs a model edit; found on site, it costs rework and delay.

How often do you run clash cycles?

Weekly by default, or to your programme and meeting rhythm.

Can you join our coordination meetings?

Yes. We run or attend them online and keep the issue log current.

What if we only have 2D drawings?

We model the missing disciplines from your drawings first, then coordinate.

Ready to start your project?

Share your drawings, model or schedule and our team will reply with scope, timeline and cost.

bottom of page