
Home / BIM Services / MEP BIM
MEP Prefabrication
Multi-trade racks, risers and spools detailed for off-site fabrication.
Since 2006
Delivering BIM and VDC
900+
Projects delivered
ISO 9001
Certified quality system
OVERVIEW
More MEP Built Off Site
We turn coordinated MEP models into fabrication-ready racks, risers and spools, so more work is done safely in the factory and less on site.
Prefabrication scopes we cover:
Multi-trade corridor racks
Riser and plant room modules
Pipe and duct spools

DELIVERABLES
What you get
Every engagement comes with clear, usable deliverables:
01
Fabrication-level MEP models
02
Spool and assembly drawings
03
Bills of materials
04
Hanger and support details
05
Installation sequence drawings
06
Clash-checked models
PROCESS
How we work
A clear five-step workflow:
1
2
3
4
5
Identify
Assemblies that suit prefabrication
Model
To fabrication detail
Coordinate
With the building and other trades
Detail
Spool and assembly drawings
Support
Factory and site queries

PROVEN ON SITE
Why MANSYCOM
Since 2006, MANSYCOM has delivered BIM on airports, metro systems, campuses and towers up to 2M sq ft, for clients including L&T, Tata Projects and Kalpataru.
Our process follows PAS 1192, COBie and IFC, so mep prefabrication fits into the wider project from day one, not as a separate deliverable.
TOOLS & STANDARDS
Tools & standards
We work to open standards and your BIM Execution Plan:
Software
Autodesk Revit and AutoCAD, with Navisworks for coordination
Standards
BIMForum LOD and the project's MEP specifications
Inputs
design drawings, schematics, equipment data and specifications
Outputs
RVT, NWC, IFC, DWG, PDF and XLSX
SECTORS
Where we use it
Where this service makes the biggest difference:




Hospitals, hotels and data-heavy buildings
Airports and metro stations
High-rise residential and commercial towers
Industrial plants and campuses
ENGAGEMENT
Ways to work with us
Start small and scale up. Choose the engagement that fits your project and your team:
OPTION 1
Pilot rack
One rack or riser detailed
OPTION 2
Prefab support
Prefab detailing across a project
OPTION 3
Dedicated team
Detailers working with your fabricator
FAQ
Frequently asked questions
Answers to the questions project teams ask us most often:
Which MEP items suit prefabrication?
Corridor racks, risers, plant rooms and repetitive spools.
Do you provide BOMs?
Yes.
Can you work to our fabricator's requirements?
Yes.
When should we start?
During coordination, before layouts are fixed.
