top of page
Cable-Stayed Bridge

BIM Modeling Services

Models Built to Be Used

Building Wireframe Design
Engineer Reviewing Blueprint

We build coordinated, data-rich BIM models from your drawings, sketches or existing models, to the level of development your project needs.

 

Every model is built for its next use:

  • Design: coordinated architecture, structure and MEP from concept to GFC

  • Construction: models ready for clash detection, 4D sequencing and quantity takeoff

  • Operations: asset data and COBie for facility management

Why MANSYCOM

Since 2006 we have modeled airports, metro stations, campuses and towers up to 2M sq ft.

 

Sikka Associates Architects: 3D BIM, September 2017 to November 2019. "The 3D BIM work assigned to MANSYCOM was performed very professionally and satisfactorily."

 

Nagpur Metro: 3D BIM and coordination for 8 stations, including an interchange.

Modern Concrete Building

What You Get

Futuristic Concrete Building

Every engagement comes with clear, usable deliverables:

  • Architectural models: walls, floors, facades, rooms and finishes

  • Structural models: foundations, frames, slabs and steel

  • MEP and fire models: HVAC, plumbing, electrical and fire protection

  • Models to your LOD: from LOD 200 concept to LOD 400 construction detail

  • Drawings from the model: plans, sections, elevations and schedules

  • Model QA report: checks against your BEP before every issue

How We Work

A clear five-step workflow:

  • 1. Brief: inputs, LOD, standards and milestones agreed in the BEP

  • 2. Setup: templates, shared coordinates and naming

  • 3. Model: discipline by discipline, with regular progress issues

  • 4. Check: QA against the BEP and a clash run before each issue

  • 5. Deliver: models, drawings and a QA report, updated for each revision

Cleaning Building Windows

Tools & Standards

Team Planning Session

We work to open standards and your BIM Execution Plan:

  • Software: Autodesk Revit, Navisworks and AutoCAD

  • Standards: ISO 19650, BIMForum LOD, COBie and IFC (ISO 16739)

  • Inputs: models, PDF or DWG drawings, sketches and specifications

  • Outputs: RVT, IFC, NWC, DWG, PDF and XLSX

Where We Use It

Where this service makes the biggest difference:

  • Airports and metro stations

  • High-rise residential and commercial towers

  • Hospitals, hotels and campuses

  • Industrial and infrastructure projects

Virtual Reality Experience

Ways to Work With Us

Team Training Session

Start small and scale up. Choose the engagement that fits your project and your team:

  • Pilot model: one floor or zone modeled to your standards, so you can check our quality

  • Dedicated modeling team: named modelers working to your templates, month to month

  • Fixed-scope project: defined disciplines, LOD and deliverables, priced up front

Frequently Asked Questions

Answers to the questions project teams ask us most often:

  • What LOD do you model to? Whatever your BEP requires, typically LOD 300 for design and LOD 350 to 400 for construction.

  • Can you work from 2D drawings? Yes. We build models from PDF or DWG drawings and flag gaps as RFIs.

  • Can you use our templates? Yes. We work in your templates, families and naming standards.

  • Do you model all disciplines? Yes: architecture, structure, MEP and fire protection.

Job interview
bottom of page