top of page
Cable-Stayed Bridge

Precast Detailing

Precast Elements Detailed for the Factory

Building Wireframe Design
Engineer Reviewing Blueprint

We detail precast panels, beams, slabs and stairs with every embed, opening and connection, so elements are cast right and fit on site.

 

Our precast detailing covers:

  • Layout and erection drawings

  • Element shop drawings with reinforcement and embeds

  • Connections, lifting points and tolerances

Why MANSYCOM

Since 2006, MANSYCOM has delivered BIM on airports, metro systems, campuses and towers up to 2M sq ft, for clients including L&T, Tata Projects and Kalpataru.

 

Our process follows ISO 19650, PAS 1192, COBie and IFC, so precast detailing fits into the wider project from day one, not as a separate deliverable.

Modern Concrete Building

What You Get

Futuristic Concrete Building

Every engagement comes with clear, usable deliverables:

  • Precast layout plans

  • Element shop drawings

  • Reinforcement and embed details

  • Erection sequence drawings

  • Element schedules and quantities

  • Clash checks against MEP openings

How We Work

A clear five-step workflow:

  • 1. Inputs: design drawings and precast system data

  • 2. Model: elements, embeds and connections

  • 3. Coordinate: openings and services

  • 4. Detail: shop and erection drawings

  • 5. Submit, revise and issue

Cleaning Building Windows

Tools & Standards

Team Planning Session

We work to open standards and your BIM Execution Plan:

  • Software: Autodesk Revit and AutoCAD, with Navisworks for coordination

  • Standards: ISO 19650, BIMForum LOD and the project's design codes

  • Inputs: engineering drawings, calculations, markups and existing models

  • Outputs: RVT, IFC, DWG, PDF and XLSX schedules

Where We Use It

Where this service makes the biggest difference:

  • Residential towers and housing

  • Industrial and warehouse buildings

  • Car parks and stadiums

  • Infrastructure elements

Virtual Reality Experience

Ways to Work With Us

Team Training Session

Start small and scale up. Choose the engagement that fits your project and your team:

  • Sample element: one element detailed for review

  • Detailing team: working with your precast factory

  • Fixed-scope package: defined elements and drawings

Frequently Asked Questions

Answers to the questions project teams ask us most often:

  • Do you detail embeds and lifting points? Yes.

  • Do you coordinate openings with MEP? Yes, before elements are cast.

  • Do you produce erection drawings? Yes, with sequence.

  • Can you work to our factory standards? Yes.

Job interview
bottom of page