
Home / BIM Services / MEP BIM
Fire Protection BIM
Sprinklers, hydrants and pump rooms, modeled and drawn.
Since 2006
Delivering BIM and VDC
900+
Projects delivered
ISO 9001
Certified quality system
OVERVIEW
Fire Protection That Fits the Ceiling
We model sprinkler, hydrant and pump systems and coordinate them with ceilings and other services, so coverage and installation both work.
Fire protection scopes we cover:
Sprinkler mains, branches and heads
Hydrants, hose reels and risers
Fire pump rooms and tanks

DELIVERABLES
What you get
Every engagement comes with clear, usable deliverables:
01
Fire protection model
02
Sprinkler layouts coordinated with ceilings
03
Riser and pump room layouts
04
Sections at congested areas
05
Schedules and quantities
06
Shop drawings for installation
PROCESS
How we work
A clear five-step workflow:
1
2
3
4
5
Inputs
Fire design, hazard classification and specifications
Model
Mains, branches and heads
Coordinate
With ceilings and other services
Document
Layouts and sections
5. Issue and revise

PROVEN ON SITE
Why MANSYCOM
Since 2006, MANSYCOM has delivered BIM on airports, metro systems, campuses and towers up to 2M sq ft, for clients including L&T, Tata Projects and Kalpataru.
Our process follows PAS 1192, COBie and IFC, so fire protection modeling & drawings fits into the wider project from day one, not as a separate deliverable.
TOOLS & STANDARDS
Tools & standards
We work to open standards and your BIM Execution Plan:
Software
Autodesk Revit and AutoCAD, with Navisworks for coordination
Standards
BIMForum LOD and the project's MEP specifications
Inputs
design drawings, schematics, equipment data and specifications
Outputs
RVT, NWC, IFC, DWG, PDF and XLSX
SECTORS
Where we use it
Where this service makes the biggest difference:




Hospitals, hotels and data-heavy buildings
Airports and metro stations
High-rise residential and commercial towers
Industrial plants and campuses
ENGAGEMENT
Ways to work with us
Start small and scale up. Choose the engagement that fits your project and your team:
OPTION 1
Pilot area
One floor modeled
OPTION 2
Fire modeling team
Working with your contractor or consultant
OPTION 3
Fixed-scope package
Defined areas and drawings
FAQ
Frequently asked questions
Answers to the questions project teams ask us most often:
Do you coordinate heads with ceilings?
Yes, with the reflected ceiling plan.
Do you model pump rooms?
Yes.
Do you produce shop drawings?
Yes.
Do you do hydraulic design?
We model to the design provided by your fire engineer.
