Mansycom Consultants, the Lead Partner of M-N-E Consortium has successfully steered implementation of Integrated Project Monitoring Solution (IPMS) at DMRC’s Phase IV expansion & other upcoming metro projects, which has gone-live on April 23, 2021. Now under 60 month maintainance. || Integration & coordination of engineering design of an industrial plant at Bawal, Rewari including of process plant facilities, achieved using 3D BIM technology for AECOM. || Implementation & maintenance support for Common Data Environment (CDE) on cloud & 5D BIM simulation using Trimble Vico Office Suite; for the purposes of engineering coordination, construction time & cost control; carried out satisfactorily for a period of 3 years; for an infrastructure project i.e. 403 MLD Surya Regional Bulk Water Supply Scheme, Thane, costing Rs 1,329.00 crores, of MMRDA under execution by L&T’s WET (Water & Effluent Treatment) IC (Independent Company), Chennai as an EPC contact, between Feb 2017 to Mar 2021. || Mansycom successfully completed implementation of 5D BIM modeling at L& T DLF Cyber Park Project, Gurugram, using Trimble’s Vico Software in the year 2017. || Mansycom has reached greater heights in 3D BIM and 4D-5D Simulation by executing Sub-cluster 03 consisting of twin towers of 37 & 43 storeys respectively of first SmartCity Project within Mumbai City i.e Saifee Burhani Upliftment Project located at Bhendi Bazaar, Mumbai between November 2015 to March 2021. || Mansycom has executed 3D BIM modelling work of 8 metro stations, including of two iconic metro stations - Sitaburdi & Zero Mile, for Nagpur Metro Rail Project, Nagpur of MAHA-Metro, for a French architectural firm – Enia Design ||

Services

PMC/ CMC

Mansycom provides a comprehensive set of Project Management Consulting (PMC) or Construction Management Consulting (CMC) services by using all the modern day practices like 5D BIM technologies as the backbone of the project or construction management decision making support. Our services cover:

  • Engineering Coordination
  • Material Management
  • Tender Document Preparation
  • Project Planning, Scheduling, Monitoring & Control
  • Construction Supervision
  • Cash flow, Cost & Risk Management
  • Quality Assurance
  • Safety Management
  • Reporting & Review
  • Project Completion & Closure
Our experience shows that the most successful project management has at its core practicality and scalability. We work to some of the tested guiding principles, which are:
  • Keep it practical & simple
  • Engage all key stakeholders
  • Define scalable consistent methodology & processes
  • Simple & effective templates and tools
  • Clear governance ensures no surprises
  • Timely & accurate project information enables informed decision-making
  • Leverage best practice, but customize to suit your environment, project, structure & people
Benefits of BIM
  • Visualization: 3D renderings can be easily generated with lesser effort.
  • Brings forward clash detection within the design cycle, thereby introducing cost efficiencies to the project – earlier/ faster design decisions/ problem resolution;
  • Provides greater certainty that the design is fully coordinated and design documentation is consistent;
  • Improved project process outcomes, such as fewer RFIs and site coordination problems;
  • Better multi-party communication and understanding from 3D visualization;
  • Reduced construction cost through reduced changes during construction;
  • Fewer claims/ litigation/ disputes/ conflicts;
  • Fabrication/ shop drawings: it can assist in producing shop drawings for various building systems, for example, the sheet metal ductwork shop drawings can be quickly produced once the model is completed.
  • Simulation analysis: a model can be easily adapted to graphically illustrate the performance of the building, such as direct sunlight study, natural ventilation, heat gain, evacuation plans, etc. as & when required.
  • Construction sequencing: a model can be effectively used to provide accurate information for material ordering, fabrication, and delivery schedules.
  • Cost estimating: BIM software has built-in cost estimating features. Material quantities can be automatically extracted, needs to be properly segregated and classified for preparing BOQs and updated when any changes are made in a model.
  • ‘As-built’ 3D model & corresponding ‘As-built’ drawings
  • ‘As-built’ 3D models for use for maintenance, facilities management
  • Transparency and accountability in construction process
  • In nut shell, improves productivity, reduces construction time & cost in implementation of capital projects