Mansycom Consultants, the Lead Partner of M-N-E Consortium has successfully steered implementation of Integrated Project Monitoring Solution (IPMS) at DMRC’s Phase IV expansion & other upcoming metro projects, which has gone-live on April 23, 2021. Now under 60 month maintainance. || Integration & coordination of engineering design of an industrial plant at Bawal, Rewari including of process plant facilities, achieved using 3D BIM technology for AECOM. || Implementation & maintenance support for Common Data Environment (CDE) on cloud & 5D BIM simulation using Trimble Vico Office Suite; for the purposes of engineering coordination, construction time & cost control; carried out satisfactorily for a period of 3 years; for an infrastructure project i.e. 403 MLD Surya Regional Bulk Water Supply Scheme, Thane, costing Rs 1,329.00 crores, of MMRDA under execution by L&T’s WET (Water & Effluent Treatment) IC (Independent Company), Chennai as an EPC contact, between Feb 2017 to Mar 2021. || Mansycom successfully completed implementation of 5D BIM modeling at L& T DLF Cyber Park Project, Gurugram, using Trimble’s Vico Software in the year 2017. || Mansycom has reached greater heights in 3D BIM and 4D-5D Simulation by executing Sub-cluster 03 consisting of twin towers of 37 & 43 storeys respectively of first SmartCity Project within Mumbai City i.e Saifee Burhani Upliftment Project located at Bhendi Bazaar, Mumbai between November 2015 to March 2021. || Mansycom has executed 3D BIM modelling work of 8 metro stations, including of two iconic metro stations - Sitaburdi & Zero Mile, for Nagpur Metro Rail Project, Nagpur of MAHA-Metro, for a French architectural firm – Enia Design ||

Our Work

Industrial

Dr Oetker Food Plant of Fun Foods Ltd, Bhiwadi

Project:
Dr Oetker factory at Manesar is spread over 5 Blocks i.e. A to E. 3D BIM model of the factory building was developed from architectural, structural & MEPF drawings to check co-ordination issues.

Scope:
Engineering co-ordination (for architect Enar Consultants) using 3D BIM modeling technology and release of shop drawings for MEPF services for the contractor (Blue Star Ltd) for erection work of the factory structures, having covered area of 2.10 lakh sqft

Block A - MEPF

Block A - MEPF